Talk to a lender or broker, and ask about pre-approval or conditional approval, while your plans are close to final and before you sign the building contract. Formal approval usually needs a signed fixed-price building contract and council-approved plans, and requirements vary by lender. Sole traders in Sydney have a few extra moving parts to line up, including income evidence, council plans and the builder's payment stages. Getting the order right protects both your budget and your peace of mind.
When Is the Right Time to Apply for Custom Home Finance?
The right time to start the conversation is once your plans are close to final and before you commit to a building contract. This is the stage to seek pre-approval or conditional approval. Formal construction loan approval usually needs a signed fixed-price building contract and council-approved plans. Each lender sets its own requirements, so ask early what it needs and in what order.
Your loan, your council approval and your builder's contract all depend on each other. If the plans or the price change after you have started the process, the lender may need to review the application again. Starting early gives you room to adjust the design or the budget before anything is binding. The trade-off is that you put in the work before every cost is locked in, so keep a buffer in your budget for changes.
A broker can compare construction loan options across a range of lenders and explain how each one handles the build period. That is a big part of how we look after clients, from the first conversation through to the final payment.
How a Construction Draw Schedule Works in NSW
A construction draw schedule releases your loan to the builder in stages as work is completed, and you only pay interest on the amount drawn down so far. Each release is usually called a progress payment.
In NSW, the Home Building Act sets rules for the building side. For work over $20,000, your contract must include a progress payment schedule, and the payments must match the work actually carried out. The maximum deposit is 10 per cent. Where Home Building Compensation Scheme cover is required, which applies to contracts over $20,000, the builder cannot ask for a deposit until the cover is in place and you have the certificate. Check that your builder is a registered builder and that your fixed price building contract spells out each stage clearly.
The lender's own terms sit on top of this. The number of drawdowns, inspection requirements, fees and the repayment type during the build are set by each lender, so read them before you sign. Some lenders may want an inspection before each release. Building Commission NSW gives $250 to $500 as an indicative cost for each progress inspection, so ask who pays for them.
NSW Government guidance also notes that when you finance a project home, repayments start once the first progress payment is made and you begin drawing on the loan.
Repayments During the Build: A Worked Example at 6.75%
During the build, your repayments are based on the amount drawn, so they rise as the home takes shape. Consider a Sydney sole trader with a $600,000 construction loan, a 12-month build and a 30-year total loan term.
These figures use an illustrative rate of 6.75% per year. Your actual rate will depend on your deposit size and your lender. Assume interest-only repayments during the build:
- After $200,000 has been drawn, interest is about $1,125 a month.
- After $400,000 has been drawn, it is about $2,250 a month.
- When the full $600,000 has been drawn, it is about $3,375 a month.
Once the build finishes, the loan moves to principal and interest over the remaining 29 years. At the same illustrative rate, that repayment is about $3,934 a month.
The outcome is that the sole trader can see the jump coming. Cash flow is lightest at the start and heaviest at the end, which matters if work quietly slows during the build. Interest-only repayments mean you are not reducing the loan during that period, which is the main trade-off. You can test your own numbers with a repayment calculator, or ask us to run them for you.
Proving Sole Trader Income for Construction Finance
Lenders look at whether you can afford the loan at a rate well above the one you are offered, and sole traders are assessed on the income they can evidence. Banks regulated by APRA must test your ability to repay at a rate at least 3 percentage points above the loan rate. APRA confirmed this buffer was unchanged in its May update.
Finance for building a new dwelling is exempt from APRA's debt-to-income limit on lenders. That exemption does not remove the serviceability test above. Lenders differ in how they treat self-employed income, so the lender you choose can affect how much you can borrow.
A clear picture of your income helps before you apply. Our borrowing capacity page explains how lenders view your income and debts. For tax matters such as how business income is reported, speak to your accountant.
Does the NSW First Home Owner Grant Apply to a Custom Build?
The NSW First Home Owner Grant is $10,000, and it can apply to a new build if you meet the eligibility rules. For vacant land with a building contract, the combined value of the land, the contract and any variations must not exceed $750,000 (Revenue NSW, as at January).
If you need the grant for settlement or for your first drawdown, the application goes through the approved agent that is providing your finance. Otherwise, you apply within 12 months of settlement or completed construction. For contracts signed on or after 1 July 2023, you must live in the home for at least 12 continuous months, starting within 12 months of completion. If this is your first purchase, our first home buyers page covers the other pieces. Check your eligibility with Revenue NSW before you rely on the grant in your budget.
A custom home is a big commitment, and you should not have to carry it alone. We stay with you from the first loan conversation through each drawdown and beyond, including a loan health check once the build is finished. Call one of our team or book an appointment at a time that works for you.
Frequently Asked Questions
When should a sole trader apply for a construction loan?
You can talk to a lender or broker, and seek pre-approval or conditional approval, while your plans are close to final and before you sign the building contract. Formal approval usually needs a signed fixed-price contract and council-approved plans, and requirements vary by lender.
Do I pay interest on the whole construction loan from day one?
No. Interest is charged on the amount drawn down so far, so repayments rise as each progress payment is released. Your lender sets the repayment type during the build.
What is the maximum deposit a NSW builder can ask for?
Under the Home Building Act, the maximum deposit is 10 per cent. Where Home Building Compensation Scheme cover is required, the builder cannot ask for a deposit until the cover certificate is given.
Does building a new home exempt me from the serviceability test?
No. Finance for building a new dwelling is exempt from APRA's debt-to-income limit on lenders, but banks must still test your ability to repay at a rate at least 3 percentage points above the loan rate.